VESTRY HALL,
LONDON

Project began: July 2016
Project completed: September 2016
Contract value: £120K

Vestry Hall is the University of West London’s music and technology building. We carried out a refurbishment to areas of the existing building, which involved addressing damp issues, carrying out basic roof works and acoustic treatment to the music performance hall.

The university initially provided us with an outline of the works before we carried out a survey to provide solutions and a plan for the refurbishment. Works were completed in different areas throughout the building to address issues which required professional attention.

 

"We were very pleased with the standard of workmanship that we saw from URBN. They worked efficiently to the time scales we provided and were very accommodating when it came to working around classes and activity inside the building. We’re located in a residential area so when they carried out work on the roof, they were very careful with access and ensured there was as little disruption as possible.

With some issues such as the damp, the URBN team weren’t sure of the solution until they actually got on site and had a good look. They came up with answers really quickly, and got on and carried out the works that were required.

We would definitely recommend URBN and would like to work with them again in the future."

Gallery

Construction & Refurbishment Projects

  • gallery-glenthorne1
    GLENTHORNE ROAD
    EXETER

    Project began: April 2020 Estimated Completion: July 2021 Value £13.1m New build student accommodation. 227 bedrooms spread over four separate buildings to include off site manufactured bathroom pods, communal spaces including reception area, common room, study areas, games room and gym. Scheme incorporates large bike storage and extensive landscaping.        

  • gallery-stmarys
    ST MARY’S HOSPITAL
    EXETER

    Project began: January 2020 Estimated Completion: 2021 Value £11.7m Construction of student accommodation in three new buildings and refurbishment of a five storey former private hospital building. 153 bedrooms, communal spaces including gym, laundry, cinema room games room and study areas.        

  • gallery-wilderness
    WILDERNESS ROAD

    Project began: April 2020 Estimated Completion: March 2021 Value £1.2m Four new build, high spec semi-detached houses for a private client, in Mannamead.            

  • P1010686
    ST MARGARET’S
    RESIDENCES

    Commence July 2019 Complete September 2021 Value £10.5m Refurbishment of former grade II listed private school buildings into luxury apartments, all being constructed to the highest specification and thermal performance to achieve EPC A or B. Also includes two new buildings, plus extensive landscaping. The scheme includes a centralised ground source heat pump heating system, […]

  • Strongland Yard
    STRONGMAN’S YARD,
    FALMOUTH

    Project began: January 2019 Estimated Completion: July 2020 Value £7.1m New build student accommodation, 138 bedrooms built across three separate buildings including gym, laundry and communal spaces.  

  • Completed Donkey Sanctuary
    DONKEY SANCTUARY,
    SIDMOUTH

    Project began: January 2019 Estimated completion: July 2019 Contract value: £1M As part of our work at The Donkey Sanctuary, Devon, we undertook the redevelopment of three existing shelters, the creation of a new shelter and on-site drainage works to improve living conditions for the sanctuary’s residents.              

to top button