VESTRY HALL

Project began: July 2016
Project completed: September 2016
Contract value: £120,000

Vestry Hall is the University of West London’s music and technology building. We carried out a refurbishment to areas of the existing building, which involved addressing damp issues, carrying out basic roof works and acoustic treatment to the music performance hall.

The university initially provided us with an outline of the works before we carried out a survey to provide solutions and a plan for the refurbishment. Works were completed in different areas throughout the building to address issues which required professional attention.

 

"We were very pleased with the standard of workmanship that we saw from URBN. They worked efficiently to the time scales we provided and were very accommodating when it came to working around classes and activity inside the building. We’re located in a residential area so when they carried out work on the roof, they were very careful with access and ensured there was as little disruption as possible.

With some issues such as the damp, the URBN team weren’t sure of the solution until they actually got on site and had a good look. They came up with answers really quickly, and got on and carried out the works that were required.

We would definitely recommend URBN and would like to work with them again in the future."

Gallery

Construction & Refurbishment Projects

  • Cathedral View IMG_9184
    CATHEDRAL VIEW

    Project began: Summer 2017 Estimated completion date: Spring 2018 We are continuing to progress well with our latest development of luxury apartments in the central location of Cathedral Yard, Exeter. Our renovation of the beautiful Grade II listed four-storey building, located above Edinburgh Woollen Mill, consists of seven luxury one, two and three-bedroom apartments, including […]

  • Dean-Clarke-House-1
    DEAN CLARKE HOUSE

    Project began: July 2014 Project completed: December 2014 Contract value: £1.1M This grade 2 listed building, formerly the Devon & Exeter hospital building was converted as a mixed use development incorporating office space and higher end residential apartments, as well as high end student accommodation. URBN were appointed to take over the redevelopment works from […]

  • Stowford-Existing-6
    STOWFORD MILL

    Project began: 2018 Estimated completion date: 2023 Contract value: Circa £24M Stowford Mill, located in Ivybridge and is one of the oldest industrial sites in Devon. Having remained empty and unused since 2012, we have been appointed to transform this iconic site back to an important contributor to the town’s economy. The site consists of […]

  • Adrenalin 10
    THE SHIP

    Project began: September 2016 Estimated completion date: February 2017 Contract value: £3.0 million The iconic Ship building in Plymouth has laid dormant for 6 years but this huge development will once again see the building occupied and become a thriving part of the Plymouth community, providing 800 new jobs to the city. Once completed, the […]

  • Library Lofts 1_LR
    OLD LIBRARY BUILDING

    Project began: July 2014 Project completed: October 2014 Contract value: £2.1 million The Old Library is a listed building in a prime location in Exeter. We carried out the full internal renovation of the building, transforming it from a basic structure into a luxury 61-bed student complex. We redesigned 44 apartments from scratch into both […]

  • gallery-vestry-2
    VESTRY HALL

    Project began: July 2016 Project completed: September 2016 Contract value: £120,000 Vestry Hall is the University of West London’s music and technology building. We carried out a refurbishment to areas of the existing building, which involved addressing damp issues, carrying out basic roof works and acoustic treatment to the music performance hall. The university initially […]